DRILLING RIG ANCHORING
A class with identifier
http://staging4.data.posccaesar.org/iso/15926-4/rdl/RDS17730452
Definition | <DRILLING RIG ANCHORING> is the <Activity> of implying to run and retrieve anchors, adjusting initial anchor tensions and testing anchors |
ISO number | 12739 |
Note | The activity is starting upon abandoning the well, all time after BOP and subsea equipment are retrieved is included until last anchor is bolstered and rig is ready to leave location. As defined by the Norwegian Oil Directorate in the "user guide for the Common Daily drilling Report System (CDRS) Report number OD-95-30" |
RDS number | RDS17730452 |
Source | Activity or Event |